N03/56 Noise barriers Wollishofen - Wädenswil
Wollishofen / Wädenswil

2550 m cased micro bored piles DN 300 mm, 124,500 tons of reinforcing steel, 500 individual foundations with 2500 m2 of formwork + 750 m3 of concrete, 110 tons of LSW steel beams, 6,300 m2 of base and lava concrete elements, 900 tons of paving installation. Civil engineering, road construction and noise protection
Image gallery
Project facts
- Year
- 2019
- Location
- Wollishofen / Wädenswil
- Region
- ZH
Download
Services
Key quantities
6,500 m3 of excavation, 5,600 m3 of excavated material transported away, 750 m of cased bored piles DN 600 mm, 2,550 m of cased micro bored piles DN 300 mm, 124,500 tons of reinforcing steel, 500 individual foundations with 2,500 m2 of formwork + 750 m3 of concrete, 110 tonnes of LSW steel beams, 6,300 m2 of base and lava concrete elements, 900 tonnes of paving installation. Civil engineering, road construction and noise protection