Infrastructure – Inseli and Chilchbüel rest areas, construction work, Sempach / Neuenkirch
Sempach / Neuenkirch

Abort confirmed. Toilet building, new construction of toilet building (shell construction), excavation work for service pipes, support for new pump pipe, sewer renovation measures, toilet building, milling off pavement, repair of edge terminations, shaft upper structure renovations, installation of pavement, signaling and renewal, environmental work
Image gallery
Project facts
- Year
- 2019
- Location
- Sempach / Neuenkirch
- Region
- LU
Download
Services
General civil engineering and road constructionconcrete workpaving construction
Key quantities
Paving and milling material 1050m3, SAMI layer 5650m2, asphalt surfaces 1720t, drainage pipes 100m, support 160m, in-situ concrete 500m3, vehicle restraint systems 270m.
Special features
Building under traffic, tight deadlines