Road construction – Reinach IO, K242
Reinach

New construction of concrete roundabout (outer diameter: 25m), demolition of the mill canal, adjustments to street drainage, street sewage pipe, street lighting, traffic counting loops, various service lines (third parties),
Image gallery
Project facts
- Year
- 2016
- Location
- Reinach
- Region
- AG
Download
Services
General civil engineering and road constructionconcrete roundaboutsengineering structuresbridge construction
Key quantities
Gravel sand approx. 3500 m3; Degrees approx. 1500 m; Paving, approx. 1700 m2, surface approx. 1800 tons, concrete roundabout 1100 m2, inlet shafts approx. 25 pieces, inspection shafts approx. 12 pieces, temporary reinforcement of the Wyna bridge with GRP slats 10 m.
Special features
Construction under intensive inner-city traffic, inner-city, 15,000 DTV civil engineering, road construction, concrete roundabouts, bridge construction, sealing