Paving construction – surrounding and paving work SPZ Nottwil

Nottwil

Surrounding and surfacing work SPZ Nottwil Figure 1

Redesign of the renovations and new buildings on the entire area of the Swiss Paraplegic Foundation, surfacing work and terrain adjustments on the lake side, redesign of the inner courtyards, new construction of the inlet runway, as well as the redesign of the entrance to the visitor center and campus with bus stop.

Image gallery

Project facts

Year
2018
Location
Nottwil
Region
LU
Enquire about this project

Services

Surroundingsroad construction

Key quantities

2,400 m3 pavement excavation, 1,450 m3 concrete excavation, 2,300 m3 excavation, sewerage and utility trenches, 2,350 m3 gravel mixture for foundation layers, 12,850 m2 leveling on foundation layers, 3,400 t installation of bituminous-bound layers. Surroundings and road construction