Skip to content

Infrastructure – N02 EP Achereggtunnel - Lopperviadukt, Stansstad / Hergiswil

Stansstad / Hergiswil

N02 EP Acheregg Tunnel - Lopper Viaduct Figure 1

Renewal of drainage systems, renewal of pavements and partial repair of pavements, repair of vehicle restraint systems and fences, repair of road edges and edge barriers, new construction of retaining walls with natural stone cladding. Repair of Lopper Viaduct LV01, LV02 including access ramp Reigeldossen, LV03 and access ramp Hergiswil (RHE) Concrete repair, renewal of bridge drainage, replacement of semicircular supports, reinforcement of abutment structure, partial replacement/renewal of bridge bearings and road crossings and transverse force bearings, replacement of sealing and coverings, repair of guide rails. Repair of stone chip protection galleries GL1/VG/3, GL2, GL5 Renewal of sealing and covering material, concrete repair of bottom and top views as well as roof edge supports, renewal of drainage, repair of corrosion protection. Acheregg Tunnel Repair of the tunnel vault, the wall cladding panels, the inlet shafts and the water pipe, creating cable shafts and expanding the cable duct.

Image gallery

Project facts

Year
2018
Location
Stansstad / Hergiswil
Region
NW
Enquire about this project

Services

Civil engineeringroad constructionbridge construction
Infrastructure – N02 EP Achereggtunnel - Lopperviadukt, Stansstad / Hergiswil — SUSTRA