Surface construction – K13 Knutwil / Dagmersellen, section Knutwil (KN K 49a) – Uffikon (excl.)
Knutwil / Dagmersellen

Resurfacing on the K13 Knutwil-Dagmersellen cantonal road. During a short construction period and under difficult conditions due to ongoing traffic, new drainage pipes for better water drainage and embankment protection for the stability of the road were installed over a length of approx. 4,500m. Renewal of the roadways, from a complete expansion including stabilization of the subsoil to milling of the surface and reconstruction for traffic safety. For the renewal of the covering, among other things, a covering of type AC 8 H PmB 45/80-80 type Zurich and an SDA 8-12 PmB-E 45/80-65 were installed to curb noise emissions in the residential areas.
Image gallery
Project facts
- Year
- 2023
- Location
- Knutwil / Dagmersellen
- Region
- LU
Download
Services
Key quantities
7,850m2 stabilization, 7,000m3 gravel mixture, 790m1 drainage, 1,000m1 Bafix, 1,450m1 closures, 13,000 tonnes of paving General civil engineering and road construction, road drainage, paving construction