Infrastructure – K 47 Oberkirch, Länggass - center

Oberkirch

K 47 Oberkirch, Länggass - center picture 1

Replacement construction of the SBB overpass, renovation of the road and construction of a new bicycle traffic facility. New construction of retaining walls on micropile foundations. Civil engineering and road construction • Raising access embankments and widening the road • Road drainage and service pipes • Retaining walls, partly on micropiles • Foundation and pavement installation in 3 layers Replacement new SBB bridge • Prefabrication of prestressed reinforced concrete bridge on site (weight approx. 400 tons) and moving with a crawler crane

Image gallery

Project facts

Year
2020
Location
Oberkirch
Region
LU
Enquire about this project

Services

Civil engineeringspecial foundation engineeringprefabrication

Key quantities

4,600 m3 excavation 5,900 m3 foundation 1,100 m1 micropiles Ø 300mm 1,660 tons of paving installation 186 tons of reinforcement 1,000 m3 concrete

Special features

• Work on/over SBB main line • Moving main element bridge 400 to over SBB tracks