Paving construction – K 15 Beromünster, Winonmühle – Cantonal border AG
Beromünster

Renovation project K 15 Beromünster, length approx. 1,300 m1, milling, demolishing the entire asphalt surface in the roadway area and sidewalk surface, demolishing edge edges and creating new ones, adapting road drainage, installing the base, binder and top layer. The work was carried out in stages in limited space.
Image gallery
Project facts
- Year
- 2022
- Location
- Beromünster
- Region
- LU
Download
Services
General civil engineering and road constructionroad drainagepaving construction
Key quantities
3,600 tonnes of pavement, 14,800 m² of milling work, 83 manhole covers replaced. General civil engineering and road construction, road drainage, paving construction