Paving construction – renovation of Richenthalstrasse Ebersecken
Ebersecken

Paving renovations, with partial renovation of drainage and edge terminations.
Image gallery
Project facts
- Year
- 2020
- Location
- Ebersecken
- Region
- LU
Download
Services
Civil engineering and road constructionsurfacing work
Key quantities
Aranden 2800m, trench excavation 400m3, drainage 250m, manhole covers 50 pieces, milling of pavement, 18000m2, pavement installation 2300ton
Special features
Installation with two pavers for the lining and the decking. Paving renovation