Skip to content

Road construction – office center, K14 village expansion, new roundabout construction

Büron

Office center, K14 village expansion, new roundabout picture 1

Total replacement and redesign of traffic junctions/roundabouts K14 and K49a in the Büron Zentrum area; two-layer concrete roundabout; Concrete bus bays; New construction and adaptation of the Dorfbach stream passage made of prefabricated concrete elements and excavation pit closure with sheet pile walls; New construction noise barrier length approx. 78m; Street drainage including SABA; - In-situ concrete work for the adaptation and renovation of various engineering structures; Sewerage and factory line work, civil engineering, road construction, concrete roundabouts, bridge construction, sound insulation, hydraulic engineering

Image gallery

Project facts

Year
2014
Location
Büron
Region
LU
Enquire about this project

Services

General civil engineering and road constructionconcrete roundaboutsengineering structuressound insulationbridge constructionhydraulic engineeringspecial foundation engineering