Road construction – office center, K14 village expansion, new roundabout construction
Büron

Total replacement and redesign of traffic junctions/roundabouts K14 and K49a in the Büron Zentrum area; two-layer concrete roundabout; Concrete bus bays; New construction and adaptation of the Dorfbach stream passage made of prefabricated concrete elements and excavation pit closure with sheet pile walls; New construction noise barrier length approx. 78m; Street drainage including SABA; - In-situ concrete work for the adaptation and renovation of various engineering structures; Sewerage and factory line work, civil engineering, road construction, concrete roundabouts, bridge construction, sound insulation, hydraulic engineering
Image gallery
Project facts
- Year
- 2014
- Location
- Büron
- Region
- LU
Download
Services
General civil engineering and road constructionconcrete roundaboutsengineering structuressound insulationbridge constructionhydraulic engineeringspecial foundation engineering