Infrastructure – New construction of cantonal road with cycle path and sidewalk, Aarburg / Oftringen

Aarburg / Oftringen

New construction of a cantonal road with a cycle path and sidewalk, Figure 1

New construction of a cantonal road with a parallel path for cyclists and pedestrians over a length of approx. 1,400m, various bus stops, 3 concrete roundabouts, new construction of an underpass for pedestrians and cyclists, various small animal culverts and stream inlets, construction of the Bernstrasse sewer line under intensive road traffic, construction of service lines for the line

Image gallery

Project facts

Year
2015
Location
Aarburg / Oftringen
Region
AG
Enquire about this project

Services

General civil engineering and road constructionconcrete roundaboutsengineering structuressound insulationbridge constructionhydraulic engineeringspecial foundation engineering

Key quantities

10,000 m2 of pavement demolition, 2,000 m1 of demolition of edge borders, 28,000 m3 of excavation of service line trenches, 3,000 m of creation of pipe block systems, 250 m1 of infilling of the main water ditch, 27,000 m3 of gravel mixture for trench filling and foundation layers, 13,500 m2 of creation of ecological Compensation areas, stream expansion over a length of 400 m1, 2000 m1 edge closures, 25,000 m2 leveling on foundation layers, 8,000 t installation of bituminous-bound layers, 700 m3 delivery and installation of structural concrete civil engineering, road construction, concrete roundabouts, bridge construction, noise insulation, hydraulic engineering